Last Deal Company

Market entry — 16 November 2026

Manufacturing in Saudi Arabia instead of exporting

Manufacturing in Saudi Arabia keeps the duty and freight an exporter pays away. What that does to revenue and profit at the same price, and where it fails.

For a manufacturer that exports to Saudi Arabia, producing in the Kingdom changes the margin far more than the revenue. At the same customer price, a Saudi plant keeps the freight and duty an exporter pays away; lower labour cost then moves the profit. Whether the case holds depends on where the manufacturer produces today.

Our Saudi manufacturing calculator models the question for machinery makers in Western Europe, Eastern Europe, the United States and China.

Process columns and production halls of an industrial plant under an overcast sky

At the same price, revenue gains only the freight and duty saved

Take EUR 100 of revenue ex works on goods shipped from Europe. In the base case, freight and handling add 4.0, an assumption, and duty adds 5.2. The GCC common external tariff is 5 % on most goods, charged on the customs value including freight and insurance.

A plant in the Kingdom charges the customer the same 109.2 and keeps 108.1 after delivery. That is the whole revenue effect: 8.1 % per unit, 6.6 % to 10.2 % across the model’s scenarios. Where local producers already set the price, the gain is smaller.

The figures in this article come from a model calculation based on public statistics and assumptions that are stated and adjustable, as of November 2026. They are illustrations, not forecasts or expected returns. Duties, origin and incentives depend on the specific product, tariff line, ownership and location. Nothing here is legal, tax, customs or investment advice. Ramp-up losses, working capital, financing costs, incentives and site-specific costs are not included. Check any decision with your own advisers.

Labour moves the profit, not electricity

For a Western European machinery maker, the base case moves profit per EUR 100 of export revenue from 8.7 to 18.1. The conservative case gives 7.1, below today, and the favourable case 23.8. Labour adds 9.0 points.

The model uses a reference labour cost of EUR 9.50 an hour in the Kingdom, against EUR 42.70 in Western European industry (Eurostat, 2025). It assumes 55 % of home productivity, and a skilled or largely Saudi workforce costs more.

Electricity adds 0.5, because energy is 0.7 % of revenue in Western European machinery (Eurostat, 2024). Saudi Energy’s industrial tariff rises from 20 to 23 halalas per kWh on 1 January 2027 (MEED, 26 October 2026).

The home region decides whether the cost case holds

US manufacturers see a similar picture. For Eastern European manufacturers the labour gap closes: Saudi labour per unit costs 99 % of their level. Profit moves from 7.2 to 8.6 in the base case, −5.2 in the conservative case and 14.4 in the favourable one.

For a Chinese manufacturer, the case is market access, not cost

Production in China costs less than in Saudi Arabia. A Chinese manufacturer’s profit per EUR 100 falls from 5.3 to 0.0 in the base case; the conservative case is negative and the favourable case gives 4.4. Matching today’s export profit would need additional revenue of 177 % of today’s exports.

The Government Tenders and Procurement Law gives priority to local content (Art. 9). The Mandatory List, kept by the LCGPA, names products that government entities must procure from national manufacturing. Bids that do not comply may be excluded.

Saudi public procurement is currently governed by the Government Tenders and Procurement Law of 2019 (Royal Decree M/128). A new Government Tenders and Procurement Law was published in Umm Al-Qura on 4 September 2026 (Royal Decree M/76). Tenders floated under the 2019 law remain governed by it. Its effect on these rules is not yet clear.

The duty advantage is certain only inside the Kingdom

In the other GCC states, duty-free trade inside the customs union requires recognised GCC origin. The basic test is at least 40 % value added in the GCC (EY Tax Alert, July 2021). Packing, mixing and simple assembly do not confer origin. Whether goods from a foreign-owned plant count as GCC origin there can depend on who owns the plant. This has to be checked case by case before a site decision.

The EU–Kenya Economic Partnership Agreement has applied since 1 July 2024, and EU industrial goods enter Egypt largely duty-free under the EU–Egypt Association Agreement (European Commission).

Where the route starts

We prepare and manage investment registration with MISA, the registration with the Ministry of Investment that Saudi Arabia’s Investment Law requires before any investment. We prepare the industrial licence application with the Ministry of Industry and Mineral Resources. In our business development and market entry work, we identify and approach potential buyers, distributors and partners. The authorities decide.

Run your own numbers in the calculator. If your board is weighing a plant in Saudi Arabia, discuss your case with Last Deal.

The figures in this article come from a model calculation based on public statistics and assumptions that are stated and adjustable, as of November 2026. They are illustrations, not forecasts or expected returns. Duties, origin and incentives depend on the specific product, tariff line, ownership and location. Nothing here is legal, tax, customs or investment advice. Ramp-up losses, working capital, financing costs, incentives and site-specific costs are not included. Check any decision with your own advisers.

Method: Saudi manufacturing calculator, with Eurostat data of 14 November 2026. Statements checked by Last Deal against the sources named.

Weighing a decision like this?

The shortest route is a free 30-minute intro call, confidential and without obligation.